JEA Northside Station
performance calculations, and execution of
the project.
Foster Wheeler North America Corp.
Two new circulating fluidized beds (CFBs),
the largest in the world, were installed at the
JEA Northside Station Units 1 & 2 to repower
existing steam turbines with more efficient,
environmentally cleaner technology. Each
consists of two CFB boilers exhausting
through independent dry scrubbers and
fabric filters to a common stack. Each boiler can produce 1,994,000 lbs/hr of steam at
2,635 psia.
were always working with the most current
set of data. ProjectWise also offered the
simple, user-friendly interface.
Foster Wheeler North selected Bentley
Project Wise to achieve the timely generation
and dissemination of information to their
project team members around the world.
Through Project Wise, the company was able
to ensure that their power project teams
Using Project Wise, Foster Wheeler was able to
capture data at its point of origin, improve dis-
tribution, control changes, and ensure that
accurate, up-to-date data was available to all. ;
Foster Wheeler’s scope of supply included
the critical piping to interconnect the new
boilers to the existing steam turbines, a
limestone preparation system, ash handling
system, and supply of the fuel crushers
Foster Wheeler’s scope of work included
assessment of existing plant equipment and
systems, environmental permitting, preliminary design and engineering, extensive plant
MANAGED ENVIRONMENT
ProjectWise
Implementation for CAD
Data Management
3. No bypass to system
4. Management of Autodesk and Bentley CAD
applications
from all MWH geographical locations. This
has made it much easier for the CAD techni-
cal group to work as a virtual team. ;
MWH
The primary goal was to provide all technical
staff in the UK and MWH’s design office in
India with fast access to a single database
with multiple data stores in a secure and
managed environment. The system needed to
manage Autodesk and Bentley CAD applications. The budget was £170,000.
MWH has been able to use the full UK CAD
Design resource in its multiple locations in a
virtual secure environment. Easy access to
existing data has also improved the re-use of
existing data for new projects.
Project Wise has given MWH the following:
1. Reference file management
2.Version control
The chief workflow efficiency derived from
ProjectWise was easy access to all UK data